[abstract]vk [accelerators]vk [admixtrure]vk [Aggregate]vk [agrregate test]vk [aquifer]vk [Batten]vk [beam]vk [Bitumen]vk [Bolt]vk [Booster]vk [Boussinesq theory]vk [Brick]vk [Bricks]vk [Bricks Study]vk [Building Materials]vk [canal]vk [cast]vk [cement]vk [CIVIL ENGINEERING]vk [Civil engineering amazing]vk [Civil engineering amazing projects]vk [class]vk [coat]vk [concrete]vk [Concrete Technology]vk [construction management]vk [Contra-flexure]vk [Cost]vk [Coulombs Theory]vk [Critical Flow]vk [Cseb]vk [csphcl exam previous year papers and admit cards]vk [docks and harbour]vk [elastic]vk [Electrical and Electronics]vk [electronics]vk [Engineer's-Knowledge]vk [ENVIRONMENTAL ENGINEERING]vk [Ese Civil 2023 questions]vk [estimate]vk [Ethics and Moral]vk [Facts-About-Engineering]vk [ferro cement]vk [first]vk [FlOW-NET]vk [FLUID MECHANICS]vk [FOUNDATION]vk [Frog]vk [Geo-technical-engineering]vk [Glass]vk [good]vk [HEART]vk [high]vk [High density concrete]vk [HIGHWAY ENGINEERING]vk [hydration]vk [Hydraulic jump]vk [important notes]vk [Instruments and Tools]vk [Iron]vk [Irrigation]vk [isochrones]vk [Job Updates & Opportunities]vk [lime]vk [Local shear failure]vk [low]vk [management]vk [mason]vk [Masonry]vk [maturity of concrete]vk [MCQ]vk [medium]vk [Mild steel]vk [mortar]vk [Optimum Compaction]vk [paint]vk [pig]vk [Plastering]vk [plastic]vk [Plasticizers]vk [prime]vk [problem]vk [Project Management]vk [properties]vk [Question-Answer]vk [quick lime]vk [Quick Revision]vk [Quick-Revision]vk [Rankine Theory]vk [RCC]vk [Recommended]vk [Reinforced Concrete Construction]vk [resection]vk [retarder]vk [RING]vk [rock]vk [scope]vk [seasoning]vk [second]vk [Self compacted]vk [sensitivity]vk [SHAKES]vk [Shear center]vk [shear strenght]vk [slope deflection method]vk [Soil exploration and Boring]vk [SOIL MECHANICS]vk [Soil Structure and Clay Mineralogy]vk [SOM]vk [Stability of Slope]vk [STAR]vk [steel]vk [Steel Engineering]vk [stiffeners]vk [stone]vk [Strength of Material]vk [Structural Steel Design]vk [structure analysis]vk [Subjects]vk [surveying]vk [syphon]vk [tack]vk [temperature]vk [templates]vk [Terzaghi Theory]vk [Test]vk [Tests]vk [third]vk [TILES]vk [timber]vk [tpes]vk [TRANSPORTATION ENGINEERING]vk [Tunnel]vk [Types of flow]vk [valuation]vk [value]vk [vee bee]vk [Wall]vk [wastage]vk [Water Supply]vk [Weld]vk [westergaard theory]vk [workability]vk

Table of Contents

Question-Answer:

The levelling is carried out between two stations P and Q separated by 1000 m. The Back Sight (BS) reading is noted as 0.70 m on station P, whose BM is 240.00 m. Next, the Fore Sight (FS) reading is taken on an intermediate point and the value is 1.25 m. Then the instrument is shifted to a new location and BS is taken on intermediate point as 0.85 m. Finally, the FS reading is taken on station Q as 1.10 m. What is the Reduced Level of Q?

  • (a) 239.20 m
  • (b) 240.80 m
  • (c) 241.25 m
  • (d) 241.80 m