The longitudinal joints in cement concrete pavements are constructed with suitable

  • (a) tie bars
  • (b) torsion rods
  • (c) small spacing
  • (d) shear rods


In which one of the following systems the optimum road length is calculated for an area based on the concept of obtaining maximum utility per unit length of road?

  • (a) Saturation system
  • (b) Unsaturated system
  • (c) Minimum utility system
  • (d) Average utility system


Which one of the following alignments is obtained by development accompanied by tunneling?

  • (a) Valley alignment
  • (b) Cross country alignment
  • (c) Mountain alignment
  • (d) Zig-zag alignment