Table of Contents

Quick Revision

Test 1 - Most important points 
Civil Enigneering



Witney’s theory is the ultimate load theory.


Witney replaced the actual parabolic stress diagram with a rectangular stress diagram such that the C.G of both the diagrams lies at the same point and their areas are also equal.

The maximum depth of concrete stress block in a balanced RCC beam is 0.53 d.


k = critical depth factor
d = effective depth of the beam
fy = characteristics strength of steel

GradekXulim
Fe 2500.530.53d
Fe 4150.480.48d
Fe 5000.460.46d
Fe 5500.440.44d
Fe 6000.430.43d




For the separation of dry dust of 10 to 100 μm size, the cyclonic separator is used.

.

Method/Device

Suitability

Efficiency

Gravity settling chamber

D > 50 μm

50 – 55 %

Cyclonic separator

D > 10 μm

60 – 65 %

Electrostatic Separator

D > 1 μm

95 - 99 %

Cotton baghouse filter

Suitable for all sizes

90 – 95 %





1. Compensating errors 


These are those which remain after mistakes and systematic errors have been eliminated and are caused by the combination of errors beyond the ability of the observer to control.

They are proportional to the square root of the length of the line.

2. Accidental errors


They represent the limit of precision in the determination of a value.

They obey the law of chance and must be handled according to the mathematical law of probability.

These errors are proportional to the square root of the length of the line (L−−√L).

3. Cumulative Errors/Systematic errors  


The errors that occur in the same direction and which finally tend to accumulate are said to be Cumulative errors.

  • They are cumulative in nature. Examples of systematic errors are Collimation in a level, Expansion of steel tape, etc.
  • They are proportional to the length of the line.

4. Random errors 


  • These are all those discrepancies remaining after the mistakes and systematic errors are removed.
  • It is mainly caused by the limitations of observer and instruments and is random in nature.

CHAIN SURVEY

  • Chain surveying is that type of surveying in which only linear measurements are made in the field.
  • This type of surveying is suitable for surveys of small extent on open ground to secure data for exact description of the boundaries of a piece of land or to take simple details.

A chain survey may be done in following steps:


i) Reconnaissance: 
  • During Reconnaissance, a reference sketch of the ground should be prepared and general arrangement of lines, principal features such as buildings, roads etc should be shown.
ii) Marking and Fixing survey stations: 
  • Before selecting the stations, the surveyor should examine the intervisibility of stations and should note the positions of the buildings, roads, streams etc.
  • After having selecting the survey stations, they should be marked to enable them to be easily discovered during the progress of the survey.
iii) Running survey lines:
  •  After having completed the preliminary work, the chaining may be started from the base line.


FLOW TYPE


  • Gradually varied flow is steady non-uniform because the velocity of water remains constant at a specified point, but it changes from one point to another point.
  • The terms steady and uniform are used frequently in engineering, and thus it is important to have a clear understanding of their meanings.

  • The term steady implies no change with time. The opposite of steady is unsteady, or transient.
  • The term uniform, however, implies no change with location over a specified region.
  • Any devices such as turbines, compressors, boilers, condensers, and heat exchangers operate for long periods of time under the same conditions, and they are classified as steady-flow devices. 
  • During steady flow, the fluid properties can change from point to point within a device, but at any fixed point, they remain constant.



Note:

  • In the case of a nozzle, the velocity of water remains constant at a specified point, but it changes from the inlet to the exit (water accelerates along with the nozzle which represents the case of steady and non-uniform flow).
  • You may be tempted to think that acceleration is zero in steady flow since acceleration is the rate of change of velocity with time, and in a steady flow, there is no change with time. 
  • Well, a garden hose nozzle will tell us that this understanding is not correct.
  • Even in a steady flow and thus constant mass flow rate, water will accelerate through the nozzle. Steady simply means no change with time at a specified location, but the value of a quantity may change from one location to another.




Flow separation 

  • It occurs when the boundary layer travels far enough against an adverse pressure gradient that the speed of the boundary layer relative to the object falls almost to zero
  • It has been observed that the flow is reversed in the vicinity of the wall under certain conditions


A one-dimensional flow is one which involves zero transverse components of flow.

Uniform flow

  • The flow is defined as uniform flow when in the flow field the velocity and other hydrodynamic parameters do not change from point to point at any instant of time. For a uniform flow, there will be no spatial distribution of hydrodynamic and other parameters.

Non-uniform flow

  • When the velocity and other hydrodynamic parameters changes from one point to another the flow is defined as non-uniform.

Steady flow

  • A steady flow is defined as a flow in which the various hydrodynamic parameters and fluid properties at any point do not change with time.

One-dimensional flow 

  • It is the flow where all the flow parameters may be expressed as functions of time and one space coordinate only. The single space coordinate is usually the distance measured along the centre-line (not necessarily straight) in which the fluid is flowing. Example: the flow in a pipe is considered one - dimensional when variations of pressure and velocity occur along the length of the pipe, but any variation over the cross-section is assumed negligible.

Turbulent fluid motion 

  • It can be considered as an irregular condition of flow in which various quantities (such as velocity components and pressure) show a random variation with time and space.


Types of equilibrium


Stable Equilibrium:

  • If the body returns to its original position by retaining the originally vertical axis as vertical.

Unstable Equilibrium:

  • If the body does not return to its original position but moves further from it.

Neutral Equilibrium:

  • If the body neither returns to its original position nor increases its displacement further, it will simply adapt its new position.
 

Stability of Floating Bodies in Fluid:

  • When the body undergoes an angular displacement about a horizontal axis, the shape of the immersed volume changes and so the centre of buoyancy moves relative to the body.

Metacentre:

  • Meta Centre is defined as the point about which a body starts oscillating when the body is tilted by a small angle.
  • The meta-centre may also be defined as the point at which the line of action of the force of buoyancy will meet the normal axis of the body when the body is given a small angular displacement.
  • For the body, M is above G, and the couple acting on the body in its displaced position is a restoring couple which tends to turn the body to its original position.
  • If M were below G, the couple would be an overturning couple and the original equilibrium would have been unstable.
  • When M coincides with G, the body will assume its new position without any further movement and thus will be in neutral equilibrium.
  •  
  • Hence the condition of stable equilibrium for a floating body can be expressed in terms of metacentric height as follows:
  • GM > 0 (M is above G) ⇒ Stable equilibrium
  • GM = 0 (M coinciding with G) ⇒ Neutral equilibrium
  • GM < 0 (M is below G) ⇒ Unstable equilibrium


Inundation or Diversion irrigation:

  • It is a type of irrigation system in which a large quantity of water flowing in a river during the flood is allowed to flood or inundate the land to be cultivated.
  • Inundation canals usually flow only during the summer months and bring in a large quantity of silt beneficial to crops.
  • Inundation irrigation is done by a canal taking off from a river in flood without any diversion work.
  • When the water available at higher level is supplied to lower level by the action of gravity only, then the type of irrigation is called flow irrigation.
  • When the dam is constructed across a river to store water during monsoons, so as to supply water in the off-taking channels during period of low flow, then it is termed as storage irrigation.
  • In Combined scheme, Dam is constructed across a river to form a reservoir, the stored water is used to produce electricity apart from irrigation purpose.


Intensity of Irrigation

  • The percentage of CCA (culturable commanded area) proposed to be irrigated in a given season is called intensity of irrigation.
  • CCA is the portion of the gross commanded area that is cultivable.
  • CCA = Gross Command Area – Uncultivable area (pasture lands, ponds, townships, waste land)
  • The annual irrigation intensity is usually found to be in the range of 40 to 60%.
  • But needs to be raised in the range of 100 to 180% by cultivating larger parts of CCA with more than one crop in a year.
  • 1. By adding intensities of irrigation for all the crop seasons we obtain the annual intensity of irrigation.
  • 2. Annual intensity of irrigation can be more than 100%.



For Closed coil fibre:

  • The major stresses in a helical spring are of two types, shear stress due to torsion and direct shear due to applied load. It is observed that for both tensile load as well as compressive load on the spring, maximum shear stress always occurs at the inner side of the spring. Hence, failure of the spring, in the form of crake, is always initiated from the inner radius of the spring.

The strength of concrete is its resistance to rupture.

  • It may be measured in number of ways, such as strength in compression, in tension, in shear, or in flexure.
  • It is generally understood that the measured compressive strength of concrete increases with increasing loading rate as the stiffness increases with increased strain rates.
  • Compressive strength decreases with decrease in rate of load because of the creep effect.
  • The concrete gets less strained when subjected to load at a faster pace.
  • We generally take 14 MPa per minute as load rate for cubes and,
  • 12 MPa per minute for cylinder according to IS 516 which gives standard test condition while performing compressive strength test.
  • The volumetric changes of concrete structures due to the loss of moisture by evaporation is known as concrete shrinkage.
  • It is a time-dependent deformation which reduces the volume of concrete without the impact of external forces.

Note:
  • The total shrinkage of concrete depends upon the constituents of concrete, size of member and environmental conditions.
  • For a given humidity and temperature, the total shrinkage of concrete is most influenced by the total amount of water present in the concrete at the time of mixing and to a lesser extent by the cement content.

As per Clause 6.2.4.1 of IS 456:2000,

The approximate value of the total shrinkage strain for design may be taken as 0.0003.


STEAM CURING

Steam curing is advantageous where early strength gain in concrete is important or where additional heat is required to accomplish hydration, as in cold weather.

So for high alumina cement where the heat of hydration is very high, steam curing can not be applied.
Curing of concrete by steam under pressure:
  • 1. Increases the rate of gain of compressive strength of concrete
  • 2. Reduces the shear strength of concrete
  • 3. Increases the speed of chemical reaction

Curing:

 It is the process of hardening the concrete mixes by keeping its surface moist for a certain period, in order to enable the concrete to gain more strength.

Properly cured concrete has an adequate amount of moisture for continued hydration which leads to:
  • Development of strength
  • volume stability.
  • resistance to freezing and thawing.
  • abrasion and scaling resistance.


RCC

  • Limit state of serviceability of prestressed concrete should satisfy cracking, deflection, and maximum compression also.
  • The crack width & deflection should not exceed the permissible limit and the maximum compressive force also should not exceed the strength of concrete.
Note: See article 19.2 & 19.3 in IS code 1343:1980
  • Minimum grade of concrete to be used in the design of prestressed concrete structure as per IS 1343 is as below:
  • 1. For Post-tensioning minimum grade of concrete used is M-30.
  • 2. For Pre-tensioning minimum grade of concrete used is M-40.
  • Hence it can be seen that grade of concrete used for prestressed member lies in the range of M30 to M60

Cover to be used in the design of prestressed concrete structure as per IS 1343 is as below:
  • 1. For Posttensioning minimum cover to be used is 30 mm.
  • 2. For Pre-tensioning minimum cover to be used is 20 mm.

Shear span

  • It is the span between the points of application of concentrated load to its adjacent Reaction force in a beam.
Note:
  • Throughout Shear Span the Shear Force is constant.
  • There might be multiple shear spans for a single beam depending upon the number and position of applied force to the numbers of supports

  • 1. The final deflection due to all loads including the effect of temperature, creep, and shrinkage and measured from as cast level of the support of floors, roofs, and other horizontal members should not normally exceed span/250.

  • 2. The deflection including the effect of temperature, creeps, and shrinkage occurring after the erection of partition and application of finishes should not normally exceed span/350 or 20 mm whichever is less.

Purlin:

  • The purlins are horizontal beams spanning between the two adjacent trusses. These are the structural members subjected to transverse loads and rest on the top chords of roof trusses. The purlins are meant to carry loads of the roofing material and to transfer it to the panel points. 
  • If the slope of roof truss is not greater than 30' and steel is conforming to grades Fe 410-0 or Fe 410-W, then, the angle purlins may be designed as an alternate to the general design procedure, as recommended by IS : 800-1984. 
  • Maximum allowable outstand is 16t for an unstiffened flange.

  • The velocity of exit, Ve should be the minimum of 2.5 of wind speed to prevent down draught.
  • The exit velocity is an important factor to prevent the spread the pollution around the surrounding. The minimum exit velocity ensures that the gases are not spread in longer vicinity.
  • Exit velocity varies from region to region depending upon the topographical, geographical, temporal, etc., and many other factors.

  • for the stone masonry, the direction of pressure in stone masonry is normal to the natural bedding plane.

BUILDING MATERIALS


  • Rock is a hard mass of stone, or a broken-off piece of a boulder, or is slang for a piece of crack cocaine. An example of a rock is a piece of stone found at the bottom of a cliff.

Metamorphic Rock

  •  iT is one of the major groups of rock that make up the crust of the Earth; it consists of pre-existing rock mass in which new minerals or textures are formed at higher temperatures and greater pressures than those present on the Earth's surface.
  • Marble is a metamorphic rock that forms when limestone is subjected to the heat and pressure of metamorphism.
  • A marble that contains impurities such as clay minerals, iron oxides, or bituminous material can be bluish, gray, pink, yellow, or black in colour.
  • As metamorphism progresses, the crystals grow larger and become easily recognizable as interlocking crystals of calcite.
  • Some other examples of metamorphic rocks are gneiss, slate, marble, schist, and quartzite.

Plutonic Rock:

  •  When magma never reaches the surface and cools to form intrusions (dikes, sills, etc) the resulting rocks are called plutonic. Examples of Plutonic rocks include aplite, greisen, and syenite.
  • Sedimentary Rock. : Rock formed of mechanical, chemical, or organic sediment: such as. a: clastic rock (as conglomerate, sandstone, or shale) formed of fragments of other rock transported from its source and deposited in water. Examples of sedimentary rocks include limestone, sandstone, mudstone, greywacke, chalk, coal, claystone, and flint.

Igneous Rock.

  •  Igneous rock is a term used for a rock formed when molten rock cools and hardens. Extrusive, or volcanic, igneous rock cools on the surface as lava. Some examples of igneous rocks are granite, gabbro, basalt.
  • Therefore, from the above facts, it is clear that Marble & Slate is an example of Metamorphic Rock.

Dressing

  • The operation of removal of impurities of clay adhering to iron ore is known as dressing. By using rock crushers this operation can be carried out.
  • Due to crushing ore particles of uniform size are obtained and the reducing gases penetrate the ores in a better way.
  • If ore contains clay, loam and other earthy matter they are washed in a stream to remove such impurities.

Calcination

  • It is the process in which the ore is heated below its melting point, either in the absence or in a limited supply of air, in an aim to drive off volatile expunges, moisture, water of hydrates and organic matter from the ore.

Purification

  • In most cases, metals and their ores occur in the ground as part of complex mixtures that also contain rocks, sand, clay, silt, and other impurities.
  • The first step in producing the metal for commercial use, therefore, is to separate the ore from waste materials with which it occurs. This is known as purification.

Refining

  • It is a process by which the purity of the metal extracted from their ores can be improved.
  • Usually, the pure metal obtained from the metal extraction is nearly 90 - 95 % only.





Schedule of rates:

A document containing a detailed description of all the items of work (but their quantities are not mentioned) together with their current rates is called schedule of rates.
These usually include general conditions, general specifications, items of different works, data for transportation, materials, and labor, method of rate analysis, plant rate analysis, and basic unit rate analysis.
​Tender:

A tender is an offer to execute some specified work or to supply some specified article at certain rates.
While inviting tender the bill of quantities, detailed specifications, conditions of the contract, and plans and drawings are supplied.
Abstract estimate

The main function of an abstract of the estimate are as follows:

The total estimated cost and the different items of works are required to complete a project can be known.
This is the basis on which percentage rate tenders are called after excluding the amounts for contingency and work-charged establishment.
This is a part of the tender document so a contractor can arrive at his own rates from the schedule of work described in the description column.
This is the basis on which bills are prepared for payment.
Analysis of rate

For the analysis of rates, knowledge of following items is necessary:

Specifications of works and materials about their quality, proportion, and construction methods.
Quantity of materials and their costs.
Cost of labors and their wages.
Location of work
Conveyance charges.
Overhead charges
Profits of contractor, consultant, and other parties involved.



Quantities so measured shall be increased by the following percentages and the results shall be included in general areas:

Corrugated steel sheets ⇒ 14%
Corrugated asbestos cement sheets ⇒ 20%
Semi-corrugated asbestos cement sheets ⇒ 10%
When color washing on asbestos cement sheets is done then the plane area of the sheets increased by 20 %.
After colour washing, area = Area + (20/100) × Area.
Corrugated surfaces shall be measured flat as fixed and not girthed.


Types of Beams

Span/effective depth 

Cantilever

7

Simply supported 

20

Continuous

26



The above basic ℓ/d ratio is applicable for spans up to 10 m. 

Beyond the span of 10 m the ℓ/d ratio should be multiplied by 10/span (m)


The quantity of work which can be done by an artisan for trade working of 8 hours is known as out - turn work.

The outturn for different types of work are as follows:

1. Sawing of softwood = 5.5 m2 per mason per day

2. Earthwork in the excavation in foundation trenches = 2.10 m3 per mason per day.

3. Cement concrete work = 4 m3 per mason per day.

4. Earthwork in the excavation in foundation = 2.75 m3 per mason per day.



Drip course, string course, and water coping are measured in running meter or m.

The units of measurements for civil engineering works are mainly categorized for their nature, shape, and size and for making payments to the contractor. The principle of units of measurements normally consists the following:

a) Single units work like doors, windows, trusses, etc., are expressed in numbers.

b) Works consist of linear measurements involve length like cornice, fencing, handrail, bands of specified width, etc., are expressed in running meters (m).

c) Works consist of areal surface measurements involve area like plastering, whitewashing, partitions of specified thickness etc., and are expressed in square meters (m2)

d) Works consist of cubical contents which involve volume like earthwork, cement concrete, Masonry, etc. are expressed in Cubic meters (m3).

DPC is measured in m2.


Material statement: The total quantities of all the items of materials required for the completion of the construction is shown in Material statement.

Bar bending schedule: Bar Bending Schedule, commonly referred to as “BBS” is a comprehensive list that describes the location, mark, type, size, length and number, and bending details of each bar or fabric in a Reinforcement Drawing of a Structure.

Work charged establishment: The work changed establishment will include the temporary establishment as are employed for the execution or the immediate technical supervision or departmental stores in connection with the specific work.

Sundries: Sundries is the column used to add prices for miscellaneous items which are not listed in the bow. For example, binding wire used to tie rebar, cover blocks etc.

  • a) For Sandy tracks – Lead × 1.4
  • b) For metal tracks – Lead × 1.0
  • c) For cartze tracks – Lead × 1.1

Standard size of brick = 19 cm × 9 cm × 9 cm
Nominal size of a brick with mortar = 20 cm × 10 cm × 10 cm
Non Modular Bricks:
Conventional size of brick = 22.4 cm × 11.4 cm × 7.6 cm



SURVEYING

Cadastral survey:

  •  Cadastral survey are made incident to the fixing of property lines, the calculation of land area, or the transfer of land property from one owner to another. They are also made to fix the boundaries of municipalities and of state and federal jurisdictions.

Topographical survey: 

  • This consist of horizontal and vertical location of certain points by linear and angular measurements and is made to determine the natural features of a country such as rivers, streams, lakes, woods, hills etc and such artificial features like roads, railways etc.

City survey:

  •  They are made in connection with the construction of streets, water supply systems, sewers and other works.

Topographical, cadastral and city survey are the parts of Land surveying

Alidade:

  •  It is a straight edge ruler having some form of sighting device. One edge of the ruler is bevelled and is graduated. Always this edge is used for drawing line of sight.

Clinometers:

  •  The clinometer is an optical device for measuring elevation angles above horizontal. The most common instruments of this type currently used are compass-clinometers from Suunto or Silva.

Cross staff:

  •  The cross staff is used to set out the perpendicular directions for offsets

Prism square: 

  • An optical square is a hand instrument used by surveyor's to lay off right angles that are multiples of 90° or of 45°.
  • They normally comprise of two optical glass penta prisms in a sturdy housing. Used for placing points on a line, offset measurements, setting our curves or determining horizontal plans.

ERRORS

  • For no error in the magnitude, the difference (degree) in the magnitude of the fore bearing and back bearing of any line is 180° or if the difference is exactly 180°, the two stations may be considered as not affected by local attraction
  • Whenever there is any station affected by local attraction, then the difference between the fore bearing and back bearing is not equal to 180°
  • A freely suspended and properly balanced magnetic needle is expected to show magnetic meridian. However, local objects like electric wires and objects of steel attract magnetic needle towards themselves
  • Thus, the needle is forced to show a slightly different direction, this disturbance is called local attraction
  • For detecting local attraction it is necessary to take both fore bearing and back bearing for each line.
  • If difference is not 180°, better to go back to the previous station and check the fore bearing
  • If that reading is same as earlier, it may be concluded that there is local attraction at one or both stations

For an open traverse with 'n' numbers of station:

  • Total no of fore bearing = n - 1, and total no back bearing = n - 1.
  • The stations can be primary classified as first station, intermediate station, and last station.
  • For every intermediate stations: One fore bearing and back bearing is required each.
  • For first station: Only one fore bearing required, No back bearing required
  • For end station: Only one back bearing required, No fore bearing required

Corrections due to refraction

  • CR = + 0.0112 d2

Correction due to curvature

  • Cc = - 0.0785 d2

Composite correction

  • C = - 0.0785 d2 + 0.0112 d2
  • C = - 0.0673 d2 
where d is the distance between the staff and instrument in km, and C is in m.




All post Here - script by vk

[abstract]vk [accelerators]vk [admixtrure]vk [Aggregate]vk [agrregate test]vk [aquifer]vk [Batten]vk [beam]vk [Bitumen]vk [Bolt]vk [Booster]vk [Boussinesq theory]vk [Brick]vk [Bricks]vk [Bricks Study]vk [Building Materials]vk [canal]vk [cast]vk [cement]vk [CIVIL ENGINEERING]vk
[abstract]vk [accelerators]vk [admixtrure]vk [Aggregate]vk [agrregate test]vk [aquifer]vk [Batten]vk [beam]vk [Bitumen]vk [Bolt]vk [Booster]vk [Boussinesq theory]vk [Brick]vk [Bricks]vk [Bricks Study]vk [Building Materials]vk [canal]vk [cast]vk [cement]vk [CIVIL ENGINEERING]vk [Civil engineering amazing]vk [Civil engineering amazing projects]vk [class]vk [coat]vk [concrete]vk [Concrete Technology]vk [construction management]vk [Contra-flexure]vk [Cost]vk [Coulombs Theory]vk [Critical Flow]vk [Cseb]vk [csphcl exam previous year papers and admit cards]vk [docks and harbour]vk [elastic]vk [Electrical and Electronics]vk [electronics]vk [Engineer's-Knowledge]vk [ENVIRONMENTAL ENGINEERING]vk [Ese Civil 2023 questions]vk [estimate]vk [Ethics and Moral]vk [Facts-About-Engineering]vk [ferro cement]vk [first]vk [FlOW-NET]vk [FLUID MECHANICS]vk [FOUNDATION]vk [Frog]vk [Geo-technical-engineering]vk [Glass]vk [good]vk [HEART]vk [high]vk [High density concrete]vk [HIGHWAY ENGINEERING]vk [hydration]vk [Hydraulic jump]vk [important notes]vk [Instruments and Tools]vk [Iron]vk [Irrigation]vk [isochrones]vk [Job Updates & Opportunities]vk [lime]vk [Local shear failure]vk [low]vk [management]vk [mason]vk [Masonry]vk [maturity of concrete]vk [MCQ]vk [medium]vk [Mild steel]vk [mortar]vk [Optimum Compaction]vk [paint]vk [pig]vk [Plastering]vk [plastic]vk [Plasticizers]vk [prime]vk [problem]vk [Project Management]vk [properties]vk [Question-Answer]vk [quick lime]vk [Quick Revision]vk [Quick-Revision]vk [Rankine Theory]vk [RCC]vk [Recommended]vk [Reinforced Concrete Construction]vk [resection]vk [retarder]vk [RING]vk [rock]vk [scope]vk [seasoning]vk [second]vk [Self compacted]vk [sensitivity]vk [SHAKES]vk [Shear center]vk [shear strenght]vk [slope deflection method]vk [Soil exploration and Boring]vk [SOIL MECHANICS]vk [Soil Structure and Clay Mineralogy]vk [SOM]vk [Stability of Slope]vk [STAR]vk [steel]vk [Steel Engineering]vk [stiffeners]vk [stone]vk [Strength of Material]vk [Structural Steel Design]vk [structure analysis]vk [Subjects]vk [surveying]vk [syphon]vk [tack]vk [temperature]vk [templates]vk [Terzaghi Theory]vk [Test]vk [Tests]vk [third]vk [TILES]vk [timber]vk [tpes]vk [TRANSPORTATION ENGINEERING]vk [Tunnel]vk [Types of flow]vk [valuation]vk [value]vk [vee bee]vk [Wall]vk [wastage]vk [Water Supply]vk [Weld]vk [westergaard theory]vk [workability]vk
[Job Updates & Opportunities]vk

Labels

abstract (1) accelerators (1) admixtrure (2) Aggregate (2) agrregate test (1) aquifer (1) Batten (1) beam (1) Bitumen (2) Bolt (1) Booster (4) Boussinesq theory (1) Brick (2) Bricks (5) Bricks Study (1) Building Materials (21) canal (2) cast (1) cement (7) CIVIL ENGINEERING (29) Civil engineering amazing (4) Civil engineering amazing projects (1) class (1) coat (1) concrete (8) Concrete Technology (6) construction management (2) Contra-flexure (1) Cost (1) Coulombs Theory (1) Critical Flow (1) Cseb (1) csphcl exam previous year papers and admit cards (1) docks and harbour (1) elastic (1) Electrical and Electronics (3) electronics (3) Engineer's-Knowledge (5) ENVIRONMENTAL ENGINEERING (5) Ese Civil 2023 questions (2) estimate (1) Ethics and Moral (1) Facts-About-Engineering (2) ferro cement (1) first (1) FlOW-NET (1) FLUID MECHANICS (5) FOUNDATION (1) Frog (1) Geo-technical-engineering (1) Glass (1) good (1) HEART (1) high (1) High density concrete (1) HIGHWAY ENGINEERING (1) hydration (1) Hydraulic jump (1) important notes (1) Instruments and Tools (2) Iron (1) Irrigation (3) isochrones (1) Job Updates & Opportunities (15) lime (5) Local shear failure (1) low (1) management (5) mason (1) Masonry (1) maturity of concrete (1) MCQ (16) medium (1) Mild steel (1) mortar (2) Optimum Compaction (1) paint (5) pig (1) Plastering (1) plastic (1) Plasticizers (1) prime (1) problem (1) Project Management (1) properties (1) Question-Answer (32) quick lime (1) Quick Revision (3) Quick-Revision (2) Rankine Theory (1) RCC (5) Recommended (1) Reinforced Concrete Construction (1) resection (1) retarder (1) RING (1) rock (2) scope (1) seasoning (2) second (1) Self compacted (1) sensitivity (2) SHAKES (1) Shear center (1) shear strenght (1) slope deflection method (1) Soil exploration and Boring (1) SOIL MECHANICS (13) Soil Structure and Clay Mineralogy (1) SOM (3) Stability of Slope (1) STAR (1) steel (3) Steel Engineering (2) stiffeners (1) stone (4) Strength of Material (9) Structural Steel Design (3) structure analysis (2) Subjects (2) surveying (9) syphon (1) tack (1) temperature (1) templates (2) Terzaghi Theory (1) Test (1) Tests (3) third (1) TILES (1) timber (5) tpes (1) TRANSPORTATION ENGINEERING (3) Tunnel (1) Types of flow (1) valuation (1) value (1) vee bee (1) Wall (1) wastage (1) Water Supply (2) Weld (1) westergaard theory (1) workability (3)